Analysis and design verification of a steel composite box-girder bridge and its temporary works.

Location
South Korea
Role
Structural analysis and design checks
Topics
Steel box girderConnectionsTemporary works

Overview

Part of the Ihwa–Samgye Road widening project, Hyeongok 2nd Bridge required structural modelling and checks for the permanent steel composite box girder and construction-related components.

Contribution

  • Model and analyse the steel composite box-girder bridge.
  • Check steel connections and temporary formwork systems.
  • Prepare engineering calculations, drawings and verification documentation.