Hyeongok 2nd Bridge.

Analysis and design verification of a steel composite box-girder bridge and its temporary works.

LocationSouth Korea
RoleStructural analysis and design checks
FieldBridge engineering
AA

Conceptual diagram · not a project drawing

01 / Context

Overview

Part of the Ihwa–Samgye Road widening project, Hyeongok 2nd Bridge required structural modelling and checks for the permanent steel composite box girder and construction-related components.

02 / My work

Contribution

  • Model and analyse the steel composite box-girder bridge.
  • Check steel connections and temporary formwork systems.
  • Prepare engineering calculations, drawings and verification documentation.