Bridge engineering
Hyeongok 2nd Bridge.
Analysis and design verification of a steel composite box-girder bridge and its temporary works.
LocationSouth Korea
RoleStructural analysis and design checks
FieldBridge engineering
Conceptual diagram · not a project drawing
01 / Context
Overview
Part of the Ihwa–Samgye Road widening project, Hyeongok 2nd Bridge required structural modelling and checks for the permanent steel composite box girder and construction-related components.
02 / My work
Contribution
- Model and analyse the steel composite box-girder bridge.
- Check steel connections and temporary formwork systems.
- Prepare engineering calculations, drawings and verification documentation.